Olympic Way – High Wycombe
Olympic Way – High Wycombe

M&E Contractor
Regal M&E Ltd
The Olympic Way development is part of a £27m regeneration project that will provide 164 new homes to replace the 1970’s built Lance Way Estate.
Project description
Corridor and Stairwell AOV System (with daily ventilation control)
Design, supply and commissioning of the window AOV system to the communal corridor areas and roof mounted ventilator units to the stair cores, incorporating a temperature control facility to offer natural ventilation for periods of excessive heat build.